School Decarbonisation in Reading with Air Source Heat Pump Installation
Discover how Eddisons secured PSDS funding and installed air source heat pumps at a Reading school, delivering comprehensive decarbonisation support from planning to commissioning.
Replacement of HORSA building at primary school
Eddisons was appointed by Launde Academy to support a Condition Improvement Fund application for the replacement of a HORSA building.
Owlcotes Multi Academy Trust PSDS Decarbonisation Project
Eddisons secured PSDS funding to modernise Pudsey Waterloo Primary School with air source heat pumps, solar PV, and LED lighting.
Remediation of RAAC for Churchfield C of E Primary School
Eddisons was appointed in a contract administration role to deliver the safe handling and delivery of the RAAC remediation works for the Diocese of St Albans Multi-Academy Trust.
STAR Multi Academy Trust Decarbonisation Projects
Eddisons secured over £1.1m in funding for low-carbon heating solutions at three schools within the STAR MAT, replacing outdated oil-fired systems with ground and air source heat pumps, alongside new radiators and PV panels.
Falcon Education Academies Trust Internal Fire Door Replacement Works
Falcon Education Academies Trust engaged Eddisons to apply for Condition Improvement Funding (CIF) for the replacement of internal fire doors at King Solomon International Business School.
County Durham Academy Refurbishment
Our Newcastle office has completed the external envelope refurbishment of a 1960’s CLASP type academic building for a client in County Durham.
Scawby Academy Fire Safety Equipment Replacement
Eddisons Commercial Ltd were appointed by St Hybalds Academy Trust to apply for Condition Improvement Funding for replacement of essential fire equipment.
Dorchester Primary School – Air Source Heat Pump Installation
We were appointed by Hull Collaborative Academy Trust to undertake a PSDS Phase 3B application for one of their sites, Dorchester Primary School.
Stanton Vale Special School – Roof Refurbishment & Solar Installation
Stanton Vale Special Schools roof had reached the end of its life, Eddisons were instructed to complete a defect analysis report of the roof.
Riverside Primary Academy Improvement Works
Eddisons Education successfully managed a £200K refurb project for Riverside Primary Academy to improve thermal performance and reduce operating costs.
Parkside Academy Refurbishment
An excess of £750,000.00 CIF funding was successfully obtained by Eddisons before beginning refurbishment works on dilapidated windows and curtain walling.
Construction of a mezzanine to St. Bede’s Inter-Church School
Project managed by Eddisons, existing dead space was transformed into first-class teaching space to cope with growing pupil numbers.
Wootton Upper School Reception Relocation
Enhancing safeguarding and accessibility at Wootton Upper School by creating a new, secure front entrance and modern reception area, improving both visitor management and staff working conditions.
Thoresby Primary School Toilet Refurbishment
Eddisons were appointed by HCAT to design and manage a toilet refurbishment project at Thoresby Primary School.
The Cedars Academy £500K New Build Sports Hall
The Cedars Academy is an all-age special educational needs school, catering for the needs of a range of pupils, Eddisons were able to help improve existing, inadequate sports facilities.
Staynor Hall Primary Academy Classroom And Nursery Extension
Eddisons were appointed by Ebor Multi Academy Trust to design and manage a new build expansion project, providing a further 96 pupil spaces and boost pre-school nursery intake from 30 to 60 children.
CIF Funded Boiler Replacement for Rydal Academy
Eddisons were appointed by Rydal Academy to apply for CIF Funding in order to replace a number of inefficient gas fired boilers. Work began after £300,000 was successfully obtained.
Brambles Academy Pitched Concrete Roof Tiles Replacement
Eddisons were appointed by Brambles Academy to apply for CIF Funding, obtaining £550,000 to replace the existing pitched concrete tiles above the academy demise.
Water Damage Building Consultancy for Yarborough Academy
Eddisons rectified a damaged roof at Yarborough Academy following substantial water leaking in and throughout the entire building, obtaining £500,000 in CIF funding for the project.
Sunderland Academy Trust Extension
Eddisons were appointed by an academy trust in Sunderland to oversee the design and project management of an academy extension, creating a Head Office with integrated training room facilities.
Armthorpe Academy Dilapidated Modular Classroom Replacement
Eddisons Education Team secured Condition Improvement Funding (CIF) to replace a dilapidated modular building used as a classroom.
Joseph Swan Academy Building Performance Upgrade
Joseph Swan Academy approached Eddisons for CIF application assistance after numerous unsuccessful attempts. £800,000 was obtained to fund the project before Eddisons led the project to replace their single glazed curtain walling system.
Woldgate School’s £1.2m Roof and Window Replacement
Eddisons secured over £1.2m in CIF funding to replace failing roofs and windows at Woldgate School, improving safety, energy efficiency and learning conditions while managing works in a live school environment.



